Road commission outlines 2022 construction projects.
Please consider helping to fund local news. Mason County Press and Oceana County Press are available for free thanks to the generous support of our advertisers and individuals. Three ways to help us: Venmo: @MasonCountyPress; Paypal: MasonCountyPress@gmail.com; Mail a check to PO BOX 21, Scottville, MI 49454.
As the weather gets warmer, road construction projects begin to heat up.
Oceana County Road Commission Managing Director Mark Timmer recently shared a list of proposed projects throughout the county, which are pending township review and provided a list of road commission projects that are a go in 2022.
Road commission projects that are ready to go include:
- 40 miles of chip seal/fog seal county-wide;
- Bridge rehabilitation on Washington Road over the Pere Marquette River;
- Crush, shape and pave 192nd Avenue from McKinley Road to White Road 2.5 miles;
- Crush, shape and pave Shelby Road from 96th Avenue east 1 mile;
- Overlay Oceana Drive from Village of Rothbury 1 mile north;
- Concrete patching/shoulder paving of Oceana Drive from Madison Road to Jefferson Road 1 mile.
Proposed projects include:
Pentwater Township
Montgomery Boulevard from the county line to the dead end: chip seal/fog seal 2,200 feet and wedge 460 feet;
Madison Road from US 31 Business Route/Monroe Road to the end: thin overlay 4,605 feet;
Madison Road from the triangle off US 31 Business Route Monroe Road: thin overlay 265 feet;
Weare Township
Crush, shape and pave Washington Road from 80th Avenue to 88th Avenue 5,450 feet (OCRC project);
Pave Jackson Road from Oceana Drive 13,900 feet to the east;
Colfax Township
Crush, shape and pave — potential special assessment —Ruth Drive Subdivision south of Washington Road 8,488 feet;
Elbridge Township
Break crush, shape and pave Polk Road east of new asphalt to east of 122nd Avenue 3,854 feet.
Miscellaneous wedging 128th Avenue from Tyler Road to Polk Road 2,700 feet;
Hart Township
Contemplating bonding several roads;
Golden Township
Overlay 56th Avenue and Tyler Road from Deer Road to 64th Avenue 6,814 feet;
Streets of Mears – 3.2 miles of chip seal and 2,300 feet of wedging;
Benona Township
Pave Stony Lake Road east of 36th Avenue to 64th Avenue 18,190 feet;
Overlay 28th Avenue from the new blacktop to Stone Road 5,544 feet — three-way split between OCRC and Benona and Claybanks townships;
Total paving of Buchanan Road from 18th Avenue to 32nd Avenue 9,020 feet;
32nd Avenue from Buchanan Road to Shelby Road 7,940 feet;
Shelby Township
Pave Baseline Road from 96th Avenue to 104th Avenue 5,540 feet;
Pave East Shelby Road from 104th Avenue to township line 5,450 feet;
Pave Hayes Road from Oceana Drive to 64th Avenue 11,200 feet;
Pave West Shelby Road from 64th Avenue to Shelby Village limits 6600 feet;
Pave Woodrow Road from east of 96th Avenue to township line 9,235 feet;
Newfield Township
Chip seal, fog seal, durapatch, wedging of Loop Road from 192nd Avenue to Hesperia Village limits 7,833 feet;
Chip seal, fog seal, 500 feet of wedging of 176th Avenue from Loop Road to Zimmer Road 5,280 feet;
Pave 200th Avenue from Pierce Road south to Baker Road, through curve 10,300 feet;
Crush, grade and leave gravel on High Tower Lake Road around High Tower Lake 5,250 feet;
Greenwood Township
Crush, shape and pave Roosevelt Road from Maple Island Road (M 120) to 192nd Avenue 10,560 feet;
Otto Township
Crush, shape and pave 116th Avenue from Wilke Road to North of Cleveland Road 5,314 feet (OCRC project);
Chip seal/fog sea/ l116th Avenue from Cleveland Road to Park Road to 120th Avenue 3,600 feet wedge 150 feet (OCRC project);
Chip seal/fog seal 116th Avenue from Wilke Road to Skeels Road 15,987 feet; wedge 1,000 feet (OCRC project);
Grant Township
Crush ,shape and pave Clay Road from 88th Avenue to 96th Avenue 5,320 feet;
Crush ,shape and pave Arthur Road from Oceana Drive to Oneida Trail 1,175 feet;
Overlay 80th Avenue from Webster Road to McKinley Road from Oceana Drive to west of 80th Avenue 2,595 feet;
Crush and shape Skeels Road from Oceana Drive to Sikkenga Road (80th Avenue) 2,540 feet;
Crush, shape and pave 68th Avenue/Arthur Road from Water Road/M 20 9,215 feet.
Claybanks Township
Partnering with Benona Township and the road commission on Stony Lake Road east of 36th Avenue to 64th Avenue.
This story is copyrighted © 2022, all rights reserved by Media Group 31, LLC, PO Box 21, Scottville, MI 49454. No portion of this story or images may be reproduced in any way, including print or broadcast, without expressed written consent.
As the services of Media Group 31, LLC news services, the information posted within the sites are archivable for public record and historical posterity. For this reason it is the policy and practice of this company to not delete postings. It is the editor’s discretion to update or edit a story when/if new information becomes available. This may be done by editing the posted story or posting a new “follow-up” story. Media Group 31, LLC or any of its agents have the right to make any changes to this policy. Refer to Use Policy for more information.